THE PROCESS - GENERAL PROCEDURES

The following report outlines the basic principles used to erect the Sprung Instant Structure. It is to be used in conjunction with the schedule provided by our Contracts department. This document is in no way a definitive guide to the erection of a Sprung Instant Structure.

The construction of a Sprung Instant Structure can be generalized into 7 distinct operations. These are:

Equipment requirements are also listed for each operation. Refer to the equipment page regarding the specifics of the equipment.

View videoView the construction process